Route A
Yar Swing Bridge is closing to vehicles for resurfacing work from 23rd September 2024. This will effect Route A and therefore a temporary timetable will be in place from 23rd September. We believe the works are scheduled to take four weeks but we will monitor the situation. Please scroll down past the standard timetable to see the temporary timetable in yellow or you can download it here.
Route A – Download Timetable
FYTbus FARES:
- Free Bus Passes Accepted.
- Standard Adult Single Fare: £2.00
- Children Under 14 Travel Free.